Elixir: Rig on the Way to Pompano, Drilling to Start Soon

Pompano Project
(Click to Enlarge)

Elixir Petroleum advises that the operator of the Pompano Project, AnaTexas Offshore Inc., has advised that the Hercules 152 jackup drilling rig commenced mobilization to the Pompano field on Jan.9, 2007. Subject to weather, it is expected the drilling unit will arrive in field over the weekend, with preparation to spud Well SL 103229 #1 commencing immediately.

Well #1 is designed to test seven potentially gas bearing sands located between 3,800 feet and 7,900 feet measured depth. Several of these sands have been productive down dip of the Well #1 location, or nearby within the Pompano field.

The Participants in Well #1 and their respective working interests are Elixir Petroleum with 25%, Buccaneer Energy with 65%, Baron Petroleum with 7.5% and Streamline Exploration with 2.5%

For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit www.riglogix.com.

Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Field Maintenance Controls Technician
Expertise: Maintenance Technician|Rig Mechanic
Location: Eighty Four, PA
Maintenance Supervisor - Drilling
Expertise: Maintenance Manager|Rig Mechanic
Location: Eighty Four, PA
Whipstock Welder
Expertise: Rig Welder|Welding|Workshop
Location: Lafayette, LA
search for more jobs

Brent Crude Oil : $51.78/BBL 0.77%
Light Crude Oil : $50.85/BBL 0.83%
Natural Gas : $2.99/MMBtu 4.77%
Updated in last 24 hours