Flowserve Wins Major Pump Order for Pearl GTL Project

Flowserve has won major pump orders for the fully integrated Pearl Gas-to-Liquids (GTL) facility being developed by Qatar Petroleum and Shell on the eastern coast of Qatar in Ras Laffan Industrial City. Pearl GTL will utilize nearly 500 Flowserve API / ANSI process pumps.

Pearl GTL is comprised of upstream gas production facilities as well as an onshore GTL plant that will produce 140,000 barrels per day of high-quality GTL fuels and products along with 120,000 barrels of oil equivalent per day of condensate, liquefied petroleum gas and ethane.

"Our company is pleased to be working with Qatar Petroleum and Shell in advancing such state-of-the-art fuel production," said Flowserve Pump Division President Tom Ferguson. "Construction is already underway with the first GTL train due to start up around the end of the decade, followed by the second train a year later.

"All of the pumps were selected based upon quality and optimal hydraulic fit, as well as the ability of Flowserve to provide the required technical expertise. Service will be available to this site from Flowserve facilities throughout the Middle East."

All pumps are built in accordance with Shell DEP, ASME (ANSI) B73 and/or API-610 standards.


Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
450637 - Staff Piping Engineer
Expertise: Mechanical Engineering|Piping Engineer
Location: Los Angeles, CA
Floor Hand
Expertise: Maintenance Technician
Location: Henderson
Maintenance Technician Mechanical
Expertise: Maintenance Technician|Mechanic|Mechanical Technician
Location: Midland
search for more jobs

Brent Crude Oil : $49.98/BBL 1.59%
Light Crude Oil : $49.18/BBL 1.56%
Natural Gas : $2.73/MMBtu 1.44%
Updated in last 24 hours