Coastal Energy Brings Phu Horm-10 Well On Stream

Phu Horm
(Click to Enlarge)
Coastal Energy says that the Phu Horm-10 well ("PH-10") located on the Phu Horm gas field, northeast Thailand, has been brought into production.

The PH-10 well was drilled in September to support the three existing producing wells; PH-3, PH-4, PH-5. It has commenced production at 7-8 million cubic feet per day ("mmcfd"). Total production from the Phu Horm field is currently averaging 90 mmcfd.

Coastal's interest in the gas field is held indirectly through APICO LLC, which retains a 35% equity share in the gas field. Coastal is APICO's largest shareholder with 36.1% interest.

Coastal's Chief Executive Frank Inouye commented:

"The Phu Horm field, which has been on stream for almost 12 months, continues to produce in line with expectations. The PH-10 well will ensure that the field has the capability to not only meet the current production demands, but any future increases."


Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Lithium Metals Unit Leader
Expertise: Production Technologist|Production Testing|Safety Engineering
Location: Kings Mountain, NC
Operations Shift Supervisor
Expertise: Production Operator
Location: Alexandria, VA
Receptionist - Corporate Campus
Expertise: Production Operator
Location: The Woodlands, TX
search for more jobs

Brent Crude Oil : $50.47/BBL 0.98%
Light Crude Oil : $49.72/BBL 1.09%
Natural Gas : $2.76/MMBtu 1.09%
Updated in last 24 hours