Entek Says High Island Well to be Abandoned

Entek Energy says the resistivity log in the MWD tool failed while drilling the High Island A301 #2 well, therefore electric logs were run after the drilling assembly was pulled out of the hole. The electric logs indicated the prospective zone was water wet. The well was drilled to MD of 4,886 feet (3,750 feet TVD). The proposed MD was 4,842 feet (3,750 feet TVD). The well will be plugged and abandoned.

Our Privacy Pledge

Most Popular Articles
Related Articles

Brent Crude Oil : $50.79/BBL 1.30%
Light Crude Oil : $49.96/BBL 1.10%
Natural Gas : $2.77/MMBtu 2.12%
Updated in last 24 hours