Blake Offshore to Convert MOPU 8 to Workover Unit

Blake Offshore is converting its jackup Mobile Offshore Production Unit, MOPU 8, into a cantilever workover and well servicing unit. It will be equipped with a 350 kip, 650 hp workover rig that will be capable of cantilevering 40 feet beyond the end of the hull. It will be supplied with a variety of pumping and mud tank configuration options which will facilitate, both conventional workover operations as well as side tracking or drilling in "Open Hole".

The converted unit which will be known as Blake Rig 208 is a Bethlehem designed Mat Slot jackup capable of operating in water depths from as shallow as 11 feet (with the Mat deballasted) to as deep as 250 feet. In addition to its cantilever capabilities the "Rig Assembly" will have complete "skid off" and rig floor "set off" capabilities. Blake is also contemplating installing propulsion assist features to the unit which will allow it to be moved and spotted on location with one 4,000hp tug boat. The rig which is to be re-classed as a Mobile Offshore Drilling Unit (MODU) is expected to be ready for operations by March 2008.

For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit

Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Expertise: Materials Management
Location: Augusta, ME
450637 - Staff Piping Engineer
Expertise: Mechanical Engineering|Piping Engineer
Location: Los Angeles, CA
Floor Hand
Expertise: Maintenance Technician
Location: Henderson
search for more jobs

Brent Crude Oil : $50.47/BBL 0.98%
Light Crude Oil : $49.72/BBL 1.09%
Natural Gas : $2.76/MMBtu 1.09%
Updated in last 24 hours