Talisman Opens Up Duart Taps Ahead of Schedule

Talisman Energy has commenced production from the Duart field approximately two months ahead of schedule.

The Duart field was discovered in 1988 and is located 116 miles northeast of Aberdeen in Block 14/20b, approximately five miles west of the Tartan platform. The field was developed with a single well tied back to the Tartan platform. Duart oil will be exported via the Flotta system, together with other Tartan area production. Initial production rates are expected to exceed 6,000 bbls/d.

The field is an integral part of Talisman's plans to prolong the life of both the Tartan platform and the Flotta export system.

Talisman Energy (UK) Limited operates the Duart field with a 50% interest and the remaining 50% is owned by Nexen Petroleum U.K. Limited.

For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit www.riglogix.com.
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
FRAC Equipment Operators needed in Midland, TX
Expertise: Fracturing|Stimulation
Location: Midland, 
 
Shell and A&M Oil & Gas Training Study
Expertise: Gas Plant Operations|Process Technician|Refinery / Plant Operations Supervisor
Location: Robert, 
 
Office Coordinator
Expertise: Customer Service|Facilities Management|Secretarial or Administrative
Location: Houston, TX
 
search for more jobs

Brent Crude Oil : $50.97/BBL 1.53%
Light Crude Oil : $48.75/BBL 1.79%
Natural Gas : $2.92/MMBtu 0.68%
Updated in last 24 hours