Hull Cracks Discovered on Bideford Dolphin

Norsk Hydro and Dolphin AS have decided to temporarily take the semisub Bideford Dolphin out of operation after small cracks were discovered in the hull. The rig was operating on the Tordis field where it has been drilling a production well. The Bideford Dolphin is securing the well and will head for land as quickly as possible for inspection and repairs.

It was on Monday, December 2nd, that Dolphin AS discovered the two cracks of five and seven centimeters long, respectively, in the structural framework of the vessel's hull. There is no danger to the rig's integrity and load capacity. The Norwegian Petroleum Directorate has been informed of the decision to take the drilling rig temporarily out of operation.


Our Privacy Pledge

Most Popular Articles

Brent Crude Oil : $51.78/BBL 0.77%
Light Crude Oil : $50.85/BBL 0.83%
Natural Gas : $2.99/MMBtu 4.77%
Updated in last 24 hours