Technip to Install Gjoa Infield Pipelines for Statoil

Gjoa Platform
(Click to Enlarge)
Technip has been awarded a contract by Statoil, worth approximately Euro 24 million (NOK 190 million) for the fabrication and installation of the infield pipelines on Gjoa. The Gjoa field is located in the blocks 35/9 and 36/7 on the Norwegian Continental Shelf, approximately 45 km west of Sognefjorden, and 60 km northeast of Troll C. The water depth in the area is between 360 to 380 meters.

The project consists of fabrication and installation of 25 km of oil and gas production and gas lift pipelines (14", 12" and 4.9").

Technip's operations and engineering center in Oslo, Norway will execute the contract. The pipelines will be welded at Technip's spoolbase located in Orkanger, Norway. The Apache, a pipelay vessel from Technip's fleet specialized in the reel lay method, will install the pipelines. Offshore installation is scheduled for 2009.

For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit

Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
O&M Turbine Wind Techs
Expertise: Mechanical Technician
Location: Oklahoma, OK
Field Operations Supervisor II Job
Expertise: Field Service Tech|Refinery / Plant Operations Supervisor|Regulatory Compliance
Location: Minneapolis, MN
Supervisor Material Operations Job
Expertise: Materials Management |Purchasing|Supply Chain Management
Location: Amarillo, TX
search for more jobs

Brent Crude Oil : $50.79/BBL 1.30%
Light Crude Oil : $49.96/BBL 1.10%
Natural Gas : $2.77/MMBtu 2.12%
Updated in last 24 hours