Yantai Raffles to Extend Frigstad's Deadline on 2nd Option Rig

Yantai Raffles Shipyard has agreed with Frigstad Discoverer Invest Ltd to extend the June 5, 2007 deadline for executing the contract to build a second rig similar to the SS Frigstad Oslo, which is currently under construction at the YRS. Under this agreement, Frigstad may now declare the option anytime before August 5, 2007.

There is no added cost for Frigstad to obtain this extension for the second option. The added yard cost, if this option is declared, is 1% per month from April 5, 2007 until June 5, 2007, and 2% per month for the following two months.

Frigstad also has a third option to build yet another rig at YRS, whether or not the above option is declared. The due date for this option is October 5, 2007.

For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit www.riglogix.com.
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Equipment Operator - San Antonio
Expertise: Coil Tubing|Driller|Production Operator
Location: San Antonio, TX
 
Junior-Level Mechanical HVAC Design / Energy Audit Engineer
Expertise: HVAC|Mechanical Engineering
Location: San Antonio, TX
 
Mechanical Superintendent, Construction
Expertise: Construction Engineer|Mechanical Technician
Location: Alvin, TX
 
search for more jobs

Brent Crude Oil : $51.46/BBL 4.63%
Light Crude Oil : $48.9/BBL 4.78%
Natural Gas : $3.18/MMBtu 0.90%
Updated in last 24 hours