Simtronics Wins Order from Aker Floating Production

Simtronics ASA has through the newly acquired Water Mist Engineering AS, received a Letter of Intent from Aker Floating Production ASA for supply of a complete active fire fighting solution to the Aker Smart 1 - FPSO Conversion project.

The value of the contract will be in excess of NOK 8.5 million. A final contract will be signed in shortly.

The project will be delivered in Q3 2007.


Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Project Engineer
Expertise: Field Service Tech
Location: Austin, TX
US El Reno: Entry Level Engineer - Cased Hole
Expertise: Wireline
Location: El Reno, OK
US El Reno: Entry Level Operator Assistant I - Logging and Perf
Expertise: QA / QC / Inspection|Well Control|Wireline
Location: El Reno, OK
search for more jobs

Brent Crude Oil : $49.98/BBL 1.59%
Light Crude Oil : $49.18/BBL 1.56%
Natural Gas : $2.73/MMBtu 1.44%
Updated in last 24 hours