BowLeven Re-spuds Offshore Cameroon Well

BowLeven plc said the D-1 exploration well, located in Block MLHP 5 offshore Cameroon, has had to be re-spudded due to mechanical and subsequent well control problems at the first location. The rig has been moved a short distance, and re-drilling of the well has now commenced. The total depth and objectives of the well remain unchanged.

The well will be drilled to a depth of approximately 10,000 feet, and total operational time is currently estimated at approximately 8 weeks.

BowLeven is in discussion with its insurers regarding the potential recoverability of costs incurred on the first drilling location.

For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit www.riglogix.com.
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Packer
Expertise: Storeman|Warehouse Person
Location: Lovell
 
Drivers
Expertise: Heavy Machinery Operator|Rig Mover|Truck / HGV Driver
Location: Midland, TX
 
Class A CDL Drivers INTERVIEW OPPORTUNITY
Expertise: Motorman
Location: San Antonio, TX
 
search for more jobs

Brent Crude Oil : $50.56/BBL 0.15%
Light Crude Oil : $47.7/BBL 0.70%
Natural Gas : $3.05/MMBtu 1.32%
Updated in last 24 hours