Altinex: Brage Onstream, Production Exceeds Expectations

Brage Platform
(Click to Enlarge)

Brage Field
(Click to Enlarge)
Altinex ASA said that Norsk Hydro has started production from the new well, 31/4-A-16 B, on the Brage field. The well was 5,643 meters long and was completed in the Statfjord reservoir, with initial production close to 13,000 boe/d of oil (1,650 boe/d net to Altinex).

The increase in production from the new well is approx. 1,000 boe/d more than expected (net to Altinex). With all wells producing, the Brage field may yield a total production of more than 4,000 boe/d net to Altinex. A-16 B is the first of several wells planned to be drilled in the Brage field and adjacent prospects over the next years. Activities on the next production well, 31/4-A-40 A, have already started.

Altinex has an owner interest of 12.6247 % in the Brage field.

For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit

Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Artificial Lift - SPS Operator Bander / Spoole
Expertise: Production Operator
Location: Midland
United States Houston: Senior Production Group Leader
Expertise: Production Operator
Location: Houston, TX
Branch Manager for Heavy Equipment Dealership in Mississippi
Expertise: Facilities Management|Mechanic
Location: Mississippi, United States, MS
search for more jobs

Brent Crude Oil : $51.78/BBL 0.77%
Light Crude Oil : $50.85/BBL 0.83%
Natural Gas : $2.99/MMBtu 4.77%
Updated in last 24 hours