Mosaic Spuds Brynog-1

Mosaic Oil NL said that the Brynog-1 well, which is operates, spudded at 7 a.m. EST on Monday. It will take approximately 18 days to drill to the planned total depth of 2240 meters on a trouble-free basis.

Brynog-1 is the last well of the Ausam Farmin Stage 1 program. The well is located approximately 25 km south of Surat Town and 1 km east of the Silver Springs to Wallumbilla gas pipeline.

Ausam will fund the first $1.5 million of the Brynog-1 well costs and then contribute pro-rated interest for any costs above $1.5 million.

The well will be drilled with nitrogen and target the Permian Tinowon Sandstone gas and/or oil reservoir in a stratigraphic trap located immediately south-southwest of the Churchie-Noorindoo area.

The Brynog Prospect has the potential to contain recoverable reserves of up to 15 BCF of gas or 2 million barrels of oil (in the P10 case).

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Floorhand - Job Fair May 31st
Expertise: Floorhand / Roughneck
Location: New Iberia, LA
 
GOM Floorhand
Expertise: Floorhand / Roughneck
Location: New Iberia, LA
 
Drilling Floorhand, Motorhand & Derrickhand
Expertise: Derrickman|Floorhand / Roughneck|Motorman
Location: Greeley
 
search for more jobs

Brent Crude Oil : $53.87/BBL 0.48%
Light Crude Oil : $50.73/BBL 0.79%
Natural Gas : $3.33/MMBtu 2.14%
Updated in last 24 hours