PA Resources Completes Didon Export System

PA Resources has now completed the offshore work on the export system. This includes the hook-up of the flexible riser to the tanker and the connection of the riser and the new export pipeline from the platform on the Didon field in Tunisia. Long periods with bad weather, i.e. strong wind, waves and swell have made the operations difficult and have delayed the work. The new export system is now completed and tested.

The next step will be to test each well and the production facilities in order to determine production capacities and performance before regular production is initialized.

After a long and intensive period of hard work for PA Resources employees and contractors, we are just a few steps from full production and reaching our target for the Didon field, says Ulrik Jansson, President and CEO, PA Resources AB.


Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Corrosion Control Document Facilitator
Expertise: Corrosion Engineering|Refinery Specialist|Technical Writing
Location: Houston, TX
Regulatory Compliance Specialist
Expertise: HSE Manager / Advisor|Offshore Position Surveying|Regulatory Compliance
Location: Houston, TX
Shipping and Receiving Specialist
Expertise: Logistics Management|Port Operations
Location: College Station, TX
search for more jobs

Brent Crude Oil : $50.47/BBL 0.98%
Light Crude Oil : $49.72/BBL 1.09%
Natural Gas : $2.76/MMBtu 1.09%
Updated in last 24 hours