Harriet JV Spuds Lee-3 Development Well

The Lee-3 development well, located in Production License TL/1 offshore Australia, is being drilled as a deviated well from the Linda Platform. The well has drilled ahead to 2,480 meters measured depth and will continue to drill to a total depth of approximately 4,400 meters measured depth (2,600 meters true vertical depth).

The Lee-3 development well is a deviated well, designed to produce gas and condensate from the Lee Gas Field, discovered by previous exploration well Lee-1. The well is expected to take approximately 15 days to reach total depth and is planned to intersect up to four producing reservoirs delineated by the Lee-2 appraisal well.

Harriet Joint Venture participants are Apache Northwest Pty Ltd as operator with 68.5%; Tap (Harriet) Pty Ltd with 12.2229% and Kufpec Australia Pty Ltd with 19.2771%.

Related Companies
For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit www.riglogix.com.

Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Field Maintenance Controls Technician
Expertise: Maintenance Technician|Rig Mechanic
Location: Eighty Four, PA
Maintenance Supervisor - Drilling
Expertise: Maintenance Manager|Rig Mechanic
Location: Eighty Four, PA
Whipstock Welder
Expertise: Rig Welder|Welding|Workshop
Location: Lafayette, LA
search for more jobs

Brent Crude Oil : $51.78/BBL 0.77%
Light Crude Oil : $50.85/BBL 0.83%
Natural Gas : $2.99/MMBtu 4.77%
Updated in last 24 hours