Doric-2 Encounters Natural Gas

Tap Oil reports that the Doric-2 well intersected a 13 meter gross interval of gas sands. Currently, production casing is being run in readiness for completing the well for gas production via the Linda Platform. The well is located in Production License TL/1 offshore Australia. The well was drilled as a deviated well from the Linda Platform.

The successful Doric-2 development well is designed to produce gas from the Doric Gas Field. The well will now be completed for production via the existing HJV gas facilities.

Harriet Joint Venture participants are Apache Northwest Pty Ltd as operator with 68.5%; Tap (Harriet) Pty Ltd with 12.2229% and Kufpec Australia Pty Ltd with 19.2771%.

Related Companies
For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit

Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
United States Broussard: AFO Monitoring Specialist, Sr
Expertise: Geoscientist
Location: Broussard, ME
Mid to Senior-Level Environmental Geologist
Expertise: Environmental Engineer|Geologist
Location: Wichita, KS
Senior GIS Analyst- Spatial Data Management
Expertise: Geoscience Technician
Location: Houston, TX
search for more jobs

Brent Crude Oil : $51.78/BBL 0.77%
Light Crude Oil : $50.85/BBL 0.83%
Natural Gas : $2.99/MMBtu 4.77%
Updated in last 24 hours