Doric-2 Gas Development Well Spuds

Harriet Field and TL/1 Block
(Click to Enlarge)
Tap Oil reports that drilling has started on the Doric-2 gas development well that is located in Production License TL/1 offshore Australia. The well will be drilled as a deviated well from the Linda Platform. The bottom hole location lies approximately 2 kilometers North-West from the Linda Platform.

To date, the well has drilled ahead to around 830 meters measured depth after having set casing to 475 meters. The well will continue to be drilled to a total depth of approximately 2,100 meters vertical depth.

The Doric-2 development well is a deviated well, designed to produce gas from the Doric Gas Field discovered and delineated by previous exploration wells Doric-1, Ulidia-1 and Dawn-1. The well is expected to take approximately 20 days to reach total depth.

Harriet Joint Venture participants are Apache Northwest Pty Ltd as operator with 68.5%; Tap (Harriet) Pty Ltd with 12.2229% and Kufpec Australia with the remaining 19.2771%.

Related Companies
For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit

Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Well Monitoring Specialist
Expertise: WellSite Supervisor
Location: Houston, TX
Chief Mechanic (6th Gen Drillship)(Contract)
Expertise: Rig Mechanic
Location: Houma, LA
ET (Deepwater Drillship)
Expertise: Rig Electrician
Location: Houma, LA
search for more jobs

Brent Crude Oil : $51.46/BBL 0.61%
Light Crude Oil : $50.52/BBL 0.64%
Natural Gas : $2.83/MMBtu 5.35%
Updated in last 24 hours