Entek Issues Update on South Marsh Island Well

On 14 December 2006, Entek Energy Limited announced its intention to commence drilling in the Gulf of Mexico Federal offshore lease South Marsh Island Block 138 ("SMI 138").

The operator has executed a drilling contract for SMI 138. The rig will be towed into to location as soon as weather conditions are favorable. Current forecasts indicate that this will probably occur on or around 27 December 2006.

This well is targeting multiple Pleistocene age Lentic sands that range in depth from 2,980 meters to 3,600 meters (9800 feet to 11,800 feet). The planned total depth is 3,627 meters (11,900 feet). The well is expected to take approximately 35 days to drill. The well is targeting an oil resource estimated at between 6 million and 10.1 million barrels of oil or if the reservoir contains gas, between 22.5 and 33.6 BCFG.

For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit www.riglogix.com.

Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Whipstock Welder
Expertise: Rig Welder|Welding|Workshop
Location: Lafayette, LA
Well Monitoring Specialist
Expertise: Drilling Consultant|MWD / LWD|Well Control
Location: Houston, TX
Expertise: Drilling Superintendent
Location: Oklahoma, United States, OK
search for more jobs

Brent Crude Oil : $51.38/BBL 2.44%
Light Crude Oil : $50.43/BBL 2.26%
Natural Gas : $3.14/MMBtu 0.94%
Updated in last 24 hours