Socar Drilling Last Well in 2006 Gunashly Program

Socar's 2006 drilling plan for the Gunashly field called for drilling three oil wells and three gas wells. To date, three oil wells and two gas wells have been drilled. Average daily production of drilled oil wells amounts to 234 tons. Average daily production of well # 427 reached 254 tons. 490,000 cubic meters of gas and 117 tons of condensate are produced a day from the well # 417. Socar plans to commission one more oil well by the end of 2006. Total depth of the well # 228 is 2,880 meters and currently the well has reached a depth of 2,120 meters.
For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit

Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Gas Storage Reservoir Engineer
Expertise: Petroleum Engineering
Location: Houston, TX
United States Odessa: Sr Field Engineer - Directional Drilling
Expertise: Directional Driller|Drilling Engineering
Location: Odessa, TX
Project Manager, Oil and Gas
Expertise: Petroleum Engineering|Project Management
Location: West Chicago, IL
search for more jobs

Brent Crude Oil : $51.46/BBL 0.61%
Light Crude Oil : $50.52/BBL 0.64%
Natural Gas : $2.83/MMBtu 5.35%
Updated in last 24 hours