Nabrajah-11 to be Suspended for Further Testing

The testing of well Nabrajah-11 in Yemen is now completed and the well is being temporarily suspended. A maximum oil rate of 650 bopd was obtained during the test. Due to restricted inflow performance this oil rate was maintained only for a short period. The well is planned to be re-entered at a later stage for further stimulation and re-testing. Further stimulation and testing of Nabrajah 9 and Nabrajah 10 will be considered.

The rig will now be moved to the Tasour 23 location to drill a basement prospect in the Tasour area. Thereafter the rig will move back to Block 43 to drill an exploration well before returning to the Nabrajah Field for further drilling.

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Mudlogger / Wellsite Geologist
Expertise: Geologist|Mud Logging
Location: Midland, TX
 
Senior Petrophysicist
Expertise: Petrophysicist
Location: Houston, TX
 
Entry Level Geologist
Expertise: Geologist
Location: Blue Bell, PA
 
search for more jobs

Brent Crude Oil : $55.86/BBL 0.73%
Light Crude Oil : $52.64/BBL 0.51%
Natural Gas : $3.42/MMBtu 0.00%
Updated in last 24 hours