Dragon Encouraged by Zhadanov Workover Results


Lam Field Turkmenistan- Chekelen Block
(Click to Enlarge)
Dragon Oil said the workover of Well Z60/66 on the Zhadanov Field was successful. The Zhadanov is located in the Cheleken Contract Area, offshore Turkmenistan.

Well Z60/66, on the Zhdanov 60 platform, was completed in Zones 8 and 9 and was tested at a rate of 350 barrels of oil per day (bopd). Prior to the workover, the well was not on production.

>"The results of the workovers on the Zhadanov Field have been encouraging to date and we are very pleased with the levels of production considering the relatively low costs associated with our workover program," commented Dragon Chairman Hussain M. Sultan. "We will continue with our planned workover program, with the next activity to be conducted on the LAM Field."

For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit www.riglogix.com.
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
United States Broussard: Senior Field Engineer - MWD/LWD
Expertise: Field Development
Location: Broussard, LA
 
Senior Well Engineer
Expertise: Drilling Engineering|Well Control
Location: United States
 
Brinefield Operations Engineer
Expertise: Field Service Tech|Pipeline Engineering|Production Engineering
Location: Magnolia, AR
 
search for more jobs

Brent Crude Oil : $54.46/BBL 0.96%
Light Crude Oil : $51.68/BBL 1.21%
Natural Gas : $3.44/MMBtu 1.99%
Updated in last 24 hours