Baraka Selects Rig for Onshore Drilling Program in Mauritania

Baraka Petroleum Limited together with its partner, CNPC International Mauritania Limited, a wholly owned subsidiary of CNPC International Limited, has selected a suitable drill rig for the Joint Venture's drilling program at Coastal Block 20, onshore Mauritania.

The land rig ZJ50LDB from drilling operator, GWDC (Great Wall Drilling Company) was sourced from Pan Jin City and has been inspected by independent consultants MODUSPEC Engineering Group, who have confirmed the rig is suitable to drill the Heron-1 well in Block 20 which has a planned total depth (TD) of 3800m.

The same rig will be used by CNPCIM to drill an exploration well in neighboring coastal Block 12 following Heron-1.(Baraka has no interest in B12). Baraka will benefit from the ongoing rig operations by sharing all associated costs including mobilization /demobilization and other well services.

The rig with casing and tubing has been mobilized for shipment to Mauritania.

The timing of the drilling operations in Block 20 is confirmed to be on track with a spud date planned for Q3 2006.

The environmental impact study of the Block 20 planned work program performed by Worley Parsons KOMEX London office, is being updated to incorporate the recent selection of the access road to the well location.


Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Well Monitoring Specialist
Expertise: WellSite Supervisor
Location: Houston, TX
Chief Mechanic (6th Gen Drillship)(Contract)
Expertise: Rig Mechanic
Location: Houma, LA
ET (Deepwater Drillship)
Expertise: Rig Electrician
Location: Houma, LA
search for more jobs

Brent Crude Oil : $51.78/BBL 0.77%
Light Crude Oil : $50.85/BBL 0.83%
Natural Gas : $2.99/MMBtu 4.77%
Updated in last 24 hours