TransGlobe Energy Completes An Nagyah #20 Well as Producer


Yemen - Block S-1
(Click to Enlarge)
TransGlobe Energy has completed another successful horizontal development well on Block S-1 in the Republic of Yemen.

An Nagyah #20 was completed as a producing Lam A oil well after flowing at a stabilized rate of 2,992 barrels of light (43 degree API) oil per day and 1,602 thousand cubic feet of gas per day on a 48/64 inch choke. The well commenced drilling on February 7, 2006, and reached a total depth of 1,985 meters, with a 754-meter horizontal section. The An Nagyah #20 well is connected to the An Nagyah facilities with a temporary pipeline to enable production to continue until a permanent flow line is constructed.

The drilling rig is now moving to the next drilling location at An Nagyah #21. The An Nagyah #21 well is a horizontal development well in the Lower Lam B reservoir. The Lower Lam B formation is found below the main Lam A producing horizon in the An Nagyah field.

In Block S-1, Yemen TransGlobe Energy holds a 25.0% working interest.

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Rail Geotechnical Engineer
Expertise: Geotechnical Engineer
Location: Nashville, TN
 
Lead Riser Engineer
Expertise: Project Engineer|Subsea Engineering|Umbilicals, Risers and Flowlines
Location: Houston, TX
 
IP.21 Engineer
Expertise: IT - Programming & Database|Software Specialist
Location: Houston, TX
 
search for more jobs

Brent Crude Oil : $56.43/BBL 0.40%
Light Crude Oil : $50.55/BBL 0.27%
Natural Gas : $2.95/MMBtu 5.44%
Updated in last 24 hours