Advanced Production and Loading Receives Order for Another LNG Ship Set

Advanced Production and Loading has received a purchase order for the design, engineering and supply of a ship set for a Submerged Turret Loading System (STL) from Daewoo Shipbuilding & Marine Engineering (DSME). The value of the contract is approximately US $8 million.

This contract represents APL's fifth order for a ship set to a LNG regasification vessel (LNGRV) to DSME. APL's final delivery will take place during autumn 2007.

The LNG regasification vessels are capable of regasifying their LNG cargoes onboard and delivering gas through a STL to be piped ashore. The vessel will be utilized to deliver regasified LNG to a deepwater port in the Gulf of Mexico and a similar facility called the NorthEast Gateway in Massachusetts Bay, near Boston, New England.


Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Field Engineer-Wireline
Expertise: Drilling Foreman / Drilling Supervisor|Perforation
Location: Odessa, TX
Wireline Engineer
Expertise: Drilling Foreman / Drilling Supervisor|Wireline
Location: Williston, ND
Perforating Specialist
Expertise: Drilling Foreman / Drilling Supervisor|Perforation
Location: Williston, ND
search for more jobs

Brent Crude Oil : $50.47/BBL 0.98%
Light Crude Oil : $49.72/BBL 1.09%
Natural Gas : $2.76/MMBtu 1.09%
Updated in last 24 hours