Anzon Spuds Manta-2 Well Offshore Australia

Gippsland Basin, Bass Strait
(Click to Enlarge)
Anzon says the Manta-2 development well located in Vic/L26 Production Licence in the Gippsland Basin offshore Australia spudded January 17, 2006.

Manta-2 is located approximately 3 kilometers to the north of the Basker Oil Field and is the second of five wells planned to develop the Basker-Manta fields for oil production (see map). The well is designed as a deviated well to develop three principal oil reservoirs discovered by the Manta-1 exploration well in 1984. Its planned total vertical depth is 2892 meters and the well is expected to take about 35 days to drill and evaluate.

Manta-2 will be drilled by the Ocean Patriot, the rig that drilled Basker-2 in August-September, 2005. This rig will also drill Basker-3, 4, and 5 which will follow Manta-2.

Participants in the Manta-2 well are Anzon Australia as operator with 50% and Beach Petroleum with the remaining 50%.

For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit

Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Well Monitoring Specialist
Expertise: WellSite Supervisor
Location: Houston, TX
Chief Mechanic (6th Gen Drillship)(Contract)
Expertise: Rig Mechanic
Location: Houma, LA
ET (Deepwater Drillship)
Expertise: Rig Electrician
Location: Houma, LA
search for more jobs

Brent Crude Oil : $50.79/BBL 1.30%
Light Crude Oil : $49.96/BBL 1.10%
Natural Gas : $2.77/MMBtu 2.12%
Updated in last 24 hours