Marley-1 Exploration Well Suspended

TL-5 Barrow Sub Basin, Australia
(Click to Enlarge)
Following re-manning of the rig after Cyclone Clare the Marley-1 exploration well has been suspended due to mechanical problems encountered when re-entering the well. The well had been drilled to a measured depth of 3,115 meters.

Suspending the Marley well at this stage will allow the Joint Venture Partners to re-evaluate the design of this high pressure well such that the primary objective can be drilled and fully evaluated. The Ensco 106 rig will move off the Marley-1 location later this week and will return to drill other Harriet Joint Venture wells in March.

The well is located in permit TL/5 in the Barrow sub-basin approximately 3.5 kilometers west-southwest of the existing Campbell Platform.

Participants in the TL/5 joint venture are Apache Northwest Pty with 68.5%; Tap (Harriet) Pty with 12.2229% and Kufpec Australia with 19.2771%.

Related Companies
For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit

Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Field Maintenance Controls Technician
Expertise: Maintenance Technician|Rig Mechanic
Location: Eighty Four, PA
Maintenance Supervisor - Drilling
Expertise: Maintenance Manager|Rig Mechanic
Location: Eighty Four, PA
Whipstock Welder
Expertise: Rig Welder|Welding|Workshop
Location: Lafayette, LA
search for more jobs

Brent Crude Oil : $51.78/BBL 0.77%
Light Crude Oil : $50.85/BBL 0.83%
Natural Gas : $2.99/MMBtu 4.77%
Updated in last 24 hours