Santos to P&A Firebird-1 Well

The Firebird 1 exploration well in JPDA 03-12 has been drilled to a total depth of 3675 meters and will now be plugged and abandoned.

The well intersected hydrocarbons in both the primary and secondary objectives and confirmed the stratigraphic potential of the play.

Flow tests were conducted however commercial rates were not established over the intervals tested. JPDA 03-12 is located in the Australia Timor Leste Petroleum Joint Development Area and is 19 kilometers from the Bayu-Undan development in the Timor Sea, northern Australia.

The participants in JPDA 03-12 are Santos (JPDA 91-12) Pty Ltd with 21.4%; ConocoPhillips (03-12) Pty Ltd as operator with 42.4%; Inpex Sahul, Ltd with 21.2%; Petroz (Timor Sea) Pty Ltd with 13.4% and Emet Pty. Ltd. with 1.6%

Related Companies
For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit

Our Privacy Pledge

Most Popular Articles

From the Career Center
Jobs that may interest you
Well Monitoring Specialist
Expertise: WellSite Supervisor
Location: Houston, TX
Chief Mechanic (6th Gen Drillship)(Contract)
Expertise: Rig Mechanic
Location: Houma, LA
ET (Deepwater Drillship)
Expertise: Rig Electrician
Location: Houma, LA
search for more jobs

Brent Crude Oil : $51.78/BBL 0.77%
Light Crude Oil : $50.85/BBL 0.83%
Natural Gas : $2.99/MMBtu 4.77%
Updated in last 24 hours