Origin Energy's Myall Creek Gas Well Tests at 21 Million Cubic Feet/day

Origin Energy Limited reports that the flow tests on the Myall Creek 5 gas appraisal well, located in the onshore Surat Basin Production License PL174, confirmed commercial flow of gas from the Basal Rewan Sandstone.

The well commenced on June 11, 2005 with the Century 7 rig. Intermediate casing (178mm) was set at 1,840 meters and the rig was released on June 19, 2005.

Drilling re-commenced on November 26th with the BJ Services Coil Tubing Unit. The well was drilled underbalanced using nitrogen to 1,925 meters and, at 0600 hours EST today, was flowing gas through the flare line at approximately 21 million cubic feet per day on a 1 inch choke with a flowing pressure of 816 psig from the basal Rewan sandstone.

At this stage it is too early to determine the level of reserves which may be being addressed by this well.

Origin Energy CSG Limited has a 100% stake in the Myall Creek 5 gas well.

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Tool Tech
Expertise: Maintenance Technician|Mechanic|Rig Mechanic
Location: New Iberia, LA
 
Downhole Mechanical Tech II : HALJP00006169 - Houston TX
Expertise: Mechanical Technician|Rig Mechanic
Location: Houston, TX
 
United States Houston: Application Evaluation Specialist
Expertise: Drilling Engineering|Field Development
Location: Houston, TX
 
search for more jobs

Brent Crude Oil : $49.3/BBL 0.80%
Light Crude Oil : $46.79/BBL 0.70%
Natural Gas : $3.04/MMBtu 0.97%
Updated in last 24 hours