Lundin Begins Phase 2 of West Heather Drilling Program

Lundin Petroleum reports that the drilling operations have resumed with the commencement of Phase 2 of the West Heather development offshore United Kingdom.

The Phase 2 development involves the drilling of two development wells. The first well will be drilled on "North Terrace" which is a separate structure next to the Broom field. The second well will be an additional infill well on the Broom producing field.

Both wells will be sub sea completed and tied back to the existing Heather platform facility

Incremental production from the development wells is anticipated to come onstream in the fourth quarter of 2005.

For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit

Our Privacy Pledge

Most Popular Articles
Related Articles

Brent Crude Oil : $51.78/BBL 0.77%
Light Crude Oil : $50.85/BBL 0.83%
Natural Gas : $2.99/MMBtu 4.77%
Updated in last 24 hours