Mustang Wins Gas Liquids Engineering Project in West Africa

Mustang Engineering has been selected by HHI to provide detail design for natural gas liquids extraction facilities, offshore Nigeria in West Africa. The project entails the construction of two trains of cryogenic gas liquids separation facilities, operating in conjunction with existing facilities in East Area joint-venture fields, to recover produced associated gas currently being flared and re-inject lean gas. Mustang's detail design is expected to be completed within 9-12 months, with project startup anticipated for 2007.
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Pressure Equipment Integrity Engineer
Expertise: Chemical Engineering|Mechanical Engineering|Process Engineer
Location: Norco, LA
 
Field Technician
Expertise: Electrical Engineering
Location: South Tucson, AZ
 
Transmission, Distribution and Communications Technical Manager
Expertise: Electrical Engineering
Location: Minneapolis, MN
 
search for more jobs

Brent Crude Oil : $50.56/BBL 0.15%
Light Crude Oil : $47.7/BBL 0.70%
Natural Gas : $3.05/MMBtu 1.32%
Updated in last 24 hours