Corybas 1 Gas Well Drilling Ahead

ARC Energy Limited reports that the gas exploration and appraisal well Corybas 1, was preparing to drill ahead following Drill Stem Test 2. The well has been drilled from 2459m to 2501 meters and core 2 cut over the interval 2501 to 2537 meters with 41% recovery.

DST 2 was conducted over the interval 2410 to 2537 meters and resulted in a gas flow of approximately 3.7 mmcfd through a 1/2-inch choke with 610 psia surface pressure.

The well will now be deepened to evaluate other potentially gas bearing zones within the Irwin River Coal Measures and High Cliff Sandstone.

Participants in the L1 and L2 (excluding the Dongara, Mondarra and Yardarino fields) and Corybas 1 are ARC Energy as operator with 50% and Origin Energy with the remaining 50%.


Our Privacy Pledge

Most Popular Articles
Related Articles

Brent Crude Oil : $51.78/BBL 0.77%
Light Crude Oil : $50.85/BBL 0.83%
Natural Gas : $2.99/MMBtu 4.77%
Updated in last 24 hours