DNO Completes Drilling at Nabrajah-3 in Yemen

Drilling of Nabrajah-3 in Block 43, Yemen has now been completed. Results from electrical logs indicate two hydrocarbon bearing intervals in the Qishn interval.

Nabrajah-3 has now reached a total depth of 1.805 meters. Results from electrical logs indicate hydrocarbons in the Qishn S2 level between 1.695 and 1.709 meters. The logs also indicate hydrocarbons in the shallower Qishn S1 level between 1.670 and 1.675 meters.

Both hydrocarbon intervals will be tested

. Nabrajah-3 is the second appraisal well following the Nabrajah-1 discovery well drilled earlier this year. Following completion of Nabrajah-3 testing the well will be suspended as a future producer and the rig will move to the Nabrajah-4 location some 800 meters east of the Nabrajah-1 surface location.

DNO is the Operator of Block 43 holding a 56.67 % interest.


Our Privacy Pledge

Most Popular Articles
Related Articles

Brent Crude Oil : $49.98/BBL 1.59%
Light Crude Oil : $49.18/BBL 1.56%
Natural Gas : $2.73/MMBtu 1.44%
Updated in last 24 hours