Swift Energy Resumes Operations at Lake Washington

Swift Energy reports that operations at its Lake Washington Field in Louisiana have been resumed following the production shut-in and evacuation due to Hurricane Ivan. Based on early indications, the field has experienced no significant damage as a result of the hurricane. Both the drilling rig and completion rig are back at work in the field. The cumulative estimated production shut-in during this period amounted to less than 0.5 Billion cubic feet equivalent ("Bcfe").
Related Companies
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles
Related Articles


Brent Crude Oil : $48.06/BBL 2.51%
Light Crude Oil : $45.77/BBL 2.17%
Natural Gas : $2.97/MMBtu 2.30%
Updated in last 24 hours