Burren Sees Success with Second M'Boundi Well

Burren announces the successful results of well MB 701, the second of two step-out appraisal wells on the M'Boundi field in Congo.

MB 701 was drilled by the operator, Maurel & Prom, to a measured depth of 2,483 meters and perforated over a 77 meter section of the Vandji B reservoir. It tested at approximately 4000 barrels of oil per day on a 40/64 inch choke, with no water content. It will be put on production shortly.

The M'Boundi field lies within the Kouilou PSA area in which Burren has a 35% working interest.
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles
Related Articles


Brent Crude Oil : $50.2/BBL 3.29%
Light Crude Oil : $47.89/BBL 3.34%
Natural Gas : $2.94/MMBtu 1.37%
Updated in last 24 hours