Barakah's PBJV to Carry Out T&I Work for 2 Pipeline Projects off Malaysia

Barakah Offshore Petroleum Berhad disclosed Friday that its wholly-owned subsidiary company, PBJV Group Sdn Bhd (PBJV), has received the 2016 work scope to transport and install offshore facilities for the 2014 to 2016 in Malaysia.

The two pipeline projects are known as P1 and P2, with the former referring to the 24 inch 26.7 mile (43 kilometer) Bardegg and Baronia Pipeline from TTJT-A to BNCPP-B which is tentatively scheduled for installation in March. P2 refers to the 24 inch 77.7 mile (125 kilometer) and Bardegg and Baronia Pipeline from DNCPP-B to E11RC, with installation planned for May.

"The total value of the Work Scope will depend the duration of the work and costs related to Project Management Team, and engineering, materials, services, engineering and other related services," Barakah said in the filing with local stock exchange Bursa Malaysia.



Have a news tip? Share it with Rigzone!
Email news@rigzone.com

WHAT DO YOU THINK?

Click on the button below to add a comment.
Post a Comment
Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

Related Companies
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE

More from this Author
Rigzone Staff
e-mail us at news@rigzone.com
 -  Farstad Shipping Sells AHTS Lady Sandr... (Sep 27)
 -  Real Energy Prepares for Tamarama-1 We... (Sep 27)
 -  Trelleborg Appoints Unique Group as it... (Sep 27)
 -  Neptune Marine Services Bags Quadrant'... (Sep 27)
 -  Richard Dyson Appointed New CEO of IO ... (Sep 27)


Most Popular Articles

From the Career Center
Jobs that may interest you
Materials Engineer
Expertise: Corrosion Engineering|Metallurgist / Materials Engineering|Plant Operations Engineer
Location: El Segundo, CA
 
Internship - Construction Management
Expertise: Construction Engineer
Location: Washington, DC
 
Outage Planner Scheduler
Expertise: Planner / Scheduler
Location: Corpus Christi, 
 
search for more jobs

Brent Crude Oil : $45.97/BBL 2.91%
Light Crude Oil : $44.67/BBL 2.74%
Natural Gas : $3/MMBtu 0.33%
Updated in last 24 hours