Stalled Kashagan Hampers Kazakhstan's Oil Output Growth
ALMATY, Oct 1 (Reuters) - Kazakhstan expects its oil production to stay around 2013 levels until 2016, when it hopes to restart the giant Kashagan oilfield halted by an industrial accident, a senior Kazakh official said on Wednesday.
The Central Asian nation aims to produce 81.8 million tonnes (1.64 million barrels per day) of crude this year, Deputy Energy Minister Magzum Mirzagaliyev told reporters on the sidelines of an international oil and gas conference.
"Next year production is expected to be at the 2014 level," he added.
The second-largest ex-Soviet oil producer after Russia raised its oil output to 81.7 million tonnes last year from 79.2 million tonnes in 2012.
A further increase in production after the 3 percent rise last year has been thwarted by delays at the giant Kashagan oilfield in the Caspian Sea.
Kashagan, the world's biggest oil find in recent decades, was launched in September last year after repeated delays and cost overruns. But its output was halted just a few weeks later after gas leaks were detected in its pipelines.
Now it is not expected to resume output before the first half of 2016. "The fact remains ... that in any case production at Kashagan finally began, there is oil in the reservoir, and we hope that once we have replaced the pipelines, output will resume in 2016," Mirzagaliyev said.
Official data show that Kazakhstan's oil output edged down to 53.6 million tonnes in January-August this year from 54.0 million in the same period of 2013.
"We expect that we will be able to meet our production target (for 2014)," Mirzagaliyev said.
"Today we are looking for resources (to keep output stable). In particular, production at (the) Tengizchevroil venture is crucial," he said.
Tengizchevroil (TCO), Kazakhstan's largest producer, is a Chevron-led joint venture which operates the mammoth Tengiz onshore oilfield in the west of the country.
TCO is due to begin scheduled repair and maintenance work this month on the Tengiz field. A senior Kazakh energy official said in July the repair work was expected to last for 45 days.
"We expect that this planned repair work will be done in a fast tempo and we believe that we will achieve planned output there," Mirzagaliyev said.
"Our latest data show that this repair may be conducted in just 23 to 28 days."
Mirzagaliyev said TCO was forecast to produce "around 27 million tonnes" of oil this year.
Last year the joint venture produced a record 27.1 million tonnes, up from 24.2 million in 2012.
Chevron holds 50 percent of TCO, while Exxon Mobil owns 25 percent, Kazakh state oil company KazMunaiGas 20 percent and Lukarco, controlled by Lukoil, the remaining 5 percent.
(Writing by Dmitry Solovyov; Editing by Tom Hogue and Mark Potter)
WHAT DO YOU THINK?
Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.
- Weatherford CEO's Rebound Plan Relies On Getting Smaller
- Iran Says Oil Market Is Too Tight For US Zero Exports Target
- China's Squeezed 'Teapots' Eye Petchem Path To Riches
- Baker Hughes: US Drillers Add Oil Rigs For Second Week In Three
- Venezuela Hands China More Oil Presence, But No Mention Of New Funds
- ExxonMobil Racks Up Discoveries in Guyana Block Eyed by Chevron
- Oil Market Sentiment Has Improved Significantly
- EU, US Eye Collaboration on Nuclear Materials
- USA Driving Activity to Increase to All-Time Highs
- EU Electricity Export to Ukraine Up 94 Percent in Two Years
- China Coal Output Falls for First Time since Government Ordered More
- TC Energy to Sell Prince Rupert Gas Pipeline Project to First Nation
- BP Pulse Buys One of Europe's Largest Truck Stops
- UK CCUS Plans Outdated: Think Tank
- I Squared Eyes Full Ownership of Europe Gas Storage Firm
- Norway Regulator Blasts Proposal to Halt New Oil and Gas Permits
- Chinese Mega Company Makes Major Oilfield Discovery
- EIA Drops 2024 Henry Hub Gas Price Forecast
- EIA and Standard Chartered Offer Up Latest Oil Price Predictions
- Red Sea Region Sees Another Watershed Incident
- Chevron Oil Project in Kazakhstan to Cost $48.5B
- OPEC Voices Encouragement after IEA Affirms Support for Oil Security
- Biden Govt Bares Strategy for Freight Charging, Hydrogen Fueling Infra
- Ukraine Hits Third Russian Refinery In Escalating Drone Strikes
- Rystad Looks at the Buzz Around White Hydrogen
- VIDEO: Missile Attack Kills Crew Transiting Gulf of Aden
- Norway Regulator Blasts Proposal to Halt New Oil and Gas Permits
- Chinese Mega Company Makes Major Oilfield Discovery
- What Is the Biggest Risk to Offshore Oil and Gas Personnel in 2024?
- Is Peak Oil Demand Close?
- Vessel Sinks in Red Sea After Missile Strike
- JP Morgan, Standard Chartered Reveal Latest Oil Price Forecasts
- Exxon Rights in Stabroek Do Not Apply to Hess Merger with Chevron: Hess
- Rystad Forecasts Net Production of Top Permian Producers in 2024
- Analysts Reveal Latest Oil Price Outlook Following OPEC+ Cut Extension