DNV GL Triples Size of New Laboratory in Singapore

DNV GL announced Monday that it has opened a new laboratory in Singapore to deliver innovative and integrated solutions for the marine and offshore industries.

The laboratory located at Gul Circle demonstrates DNV GL’s continued commitment to be an integral part of Singapore’s marine and offshore cluster. The laboratory was officially opened March 1 by Norway’s Foreign Minister Borge Brende and DNV GL Group Executive Vice President Remi Eriksen.

Driven by recent deepwater-technology developments, the laboratory has been increasingly involved in challenging projects aimed at providing integrated solutions through testing, qualification and assessment for oil fields in harsher environments. 

Structured into four service areas, each possessing specific disciplinary capabilities and complementary competencies, the new laboratory will be able to undertake a broad range of services - from microstructure to mega structure and from laboratory testing to field services.

“Today marked yet another milestone for DNV GL. Our Singapore laboratory has been building trust and confidence for three decades, delivering worldwide projects for customers across the maritime, oil & gas and even infrastructure industries,” said Remi Eriksen and added, “The new laboratory will operate in premises three times bigger than before and is equipped with state-of-the-art facilities and higher performance machinery, greatly enhancing our ability to deliver high-end services so that our customers can meet increasing challenges.”

“DNV GL, and this new laboratory, are prime examples of the interconnected value chains between Norway and this region - where innovation, technology, integration and infrastructure mutually enforces each other. Norway’s close relationship with Singapore can be seen in this perspective. It is our ability to innovate and think anew that makes us stay ahead,” said Brende

Some of the advanced performance test machines and facilities available in the new laboratory include:

  1. A 2500KN Dynamic Testing Machine which is capable of testing larger components and thicker materials used in offshore projects
  2. A strong floor with a 50 percent increase in length - capable of accommodating full–length 39 feet (12-meter) linepipe testing
  3. A 4.2 feet (1.3-meter) Gantry Cutting Machine that can handle the large diameter linepipe which is increasingly used in transporting gas

WHAT DO YOU THINK?

Click on the button below to add a comment.
Post a Comment
Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

Related Companies
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Planner / Scheduler
Expertise: Engineering Technician
Location: Bellingham, WA
 
Biologist (On-call)
Expertise: Chemical Engineering
Location: San Diego, CA
 
Senior Manager, Substation Field and Commissioning Engineering Job
Expertise: Commissioning Engineer / HUC|Electrical Engineering
Location: Denver, CO
 
search for more jobs

Natural Gas : $3.64/MMBtu 0.27%
Brent Crude Oil : $53.93/BBL 1.83%
Light Crude Oil : $50.93/BBL 1.66%
Updated in last 24 hours