Finance & Investing
News Services
Newsletters
Get free industry updates via email.
Daily News
Weekly News
Equipment Updates
Weekly Job Register
Monthly Event Guide
Our privacy
pledge.


advertisement

Drilling Commences at Worrior-10 Appraisal Well in Cooper Basin in SA

change text size

Cooper Energy Limited disclosed Friday that Worrior-10 appraisal well, targeting the Patchawarra Formation on the flank of Worrior field in PPL 207 in southern Cooper Basin, South Australia, was spud at 9:15 am Feb. 27 and at 6:00 am Feb. 28 was drilling ahead at 1,033 feet (315 meters). The well has a prognosed total depth of 5,872 feet (1,790 meters) and is expected to take 14 days to drill, evaluate and complete.

In November 2013 Worrior-8 flowed oil at a stabilized rate of 670 barrels per day with 0.7 million standard cubic feet (MMscf) of gas from the Patchawarra Formation on production test. This was the first Patchawarra Formation oil production at the Worrior field. Worrior-10 is targeted to appraise the areal extent of the Patchawarra Formation oil pool. The well is located 2,296 feet (700 meters) north-west of Worrior-8 and adjacent to Pando-1 drilled in 1966 that recovered 498 feet (152 meters) of gas and oil cut muddy water in the drill pipe on DST from the Patchawarra Formation.

Participating interests in the PPL 207 are:

  • Cooper Energy (30 percent)
  • Senex Energy Limited (70 percent and Operator)

WHAT DO YOU THINK?

Post a Comment Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

Related Companies

Most Popular Articles
From the Career Center
Jobs that may interest you
Directional Driller
Expertise: Directional Driller
Location: Midland, MI
 
Well Operations Engineer
Expertise: Drilling Consultant, Drilling Engineering
Location: Houston, TX
 
Drilling Supervisor
Expertise: Drilling Superintendent
Location: North Slope, AK
 
search for more jobs