Production Resumes at Causeway, Cormorant East Fields

Canada's Antrim Energy reported Friday that the Causeway and Cormorant East fields in the North Sea have resumed production.

The fields had been taken offline because of routine maintenance on the North Cormorant platform, which has now been completed.

Production rates from the Causeway field are expected to rise over the next year with the start-up of electrical submersible pumps and the beginning of water injection.

Antrim holds a 35.5-percent working interest in the Causeway field, while it has an 8.4-percent stake in the Cormorant East field.

 



Have a news tip? Share it with Rigzone!
Email news@rigzone.com

WHAT DO YOU THINK?

Click on the button below to add a comment.
Post a Comment
Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

Related Companies
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE

More from this Author
Rigzone Staff
e-mail us at news@rigzone.com
 -  Lundin Norway Makes Oil, Gas Find in B... (Feb 24)
 -  PSA: Norway's Petroleum Industry Must ... (Feb 24)
 -  Sound Energy Progresses Tendrara Drill... (Feb 24)
 -  Lukoil Finds Oil at Iraq Well (Feb 22)
 -  Gazpromneft-Sakhalin: Ayashsky License... (Feb 22)


Most Popular Articles

From the Career Center
Jobs that may interest you
B Operator
Expertise: Production Operator
Location: Lafayette, LA
 
Fieldman - Delaware Midstream
Expertise: Production Operator
Location: Kermit, TX
 
Rope Access Inspector Level 2/3
Expertise: Asset Integrity Engineer|NDT Technician|QA / QC / Inspection
Location: Magnolia, TX
 
search for more jobs

Brent Crude Oil : $56.58/BBL 1.32%
Light Crude Oil : $54.45/BBL 1.60%
Natural Gas : $2.62/MMBtu 1.15%
Updated in last 24 hours