Production Resumes at Causeway, Cormorant East Fields

Printer Friendly Version
Email this Page

Canada's Antrim Energy reported Friday that the Causeway and Cormorant East fields in the North Sea have resumed production.

The fields had been taken offline because of routine maintenance on the North Cormorant platform, which has now been completed.

Production rates from the Causeway field are expected to rise over the next year with the start-up of electrical submersible pumps and the beginning of water injection.

Antrim holds a 35.5-percent working interest in the Causeway field, while it has an 8.4-percent stake in the Cormorant East field.

 



Have a news tip? Share it with Rigzone!
Email news@rigzone.com

Printer Friendly Version
Email this Page

WHAT DO YOU THINK?

Post a Comment Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

Related Companies
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE

More from this Author
Rigzone Staff
e-mail us at news@rigzone.com
 -  Bumi Armada's 1Q 2015 Net Profit Up 11... (May 27)
 -  UZMA Secures $46.1M Helicopter Service... (May 26)
 -  Malaysian Barakah's Subsidiary PBJV Re... (May 26)
 -  Rosneft Rings Management Changes (May 26)
 -  Kea Petroleum Fails to Secure Funding ... (May 26)


Most Popular Articles

From the Career Center
Jobs that may interest you
Fire Protection Engineer (Principal/Lead)
Expertise: Fire Protection|Mechanical Engineering|Process Engineer
Location: Houston, TX
 
Mechanical Engineer - Pressure Vessels
Expertise: Mechanical Engineering
Location: Houston, TX
 
Environmental Process Engineering Manager
Expertise: Design Engineer|Environmental Engineer|Process Engineer
Location: Houston, TX
 
search for more jobs

Brent Crude Oil : $63.72/BBL 2.52%
Light Crude Oil : $58.03/BBL 2.82%
Natural Gas : $2.82/MMBtu 2.42%
Updated in last 24 hours