Production Resumes at Causeway, Cormorant East Fields

Canada's Antrim Energy reported Friday that the Causeway and Cormorant East fields in the North Sea have resumed production.

The fields had been taken offline because of routine maintenance on the North Cormorant platform, which has now been completed.

Production rates from the Causeway field are expected to rise over the next year with the start-up of electrical submersible pumps and the beginning of water injection.

Antrim holds a 35.5-percent working interest in the Causeway field, while it has an 8.4-percent stake in the Cormorant East field.

 



Have a news tip? Share it with Rigzone!
Email news@rigzone.com

WHAT DO YOU THINK?

Post a Comment Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

Related Companies
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE

More from this Author
Rigzone Staff
e-mail us at news@rigzone.com
 -  Buru Energy Hits Oil at Praslin 1 Well (Aug 28)
 -  IOG Gets 3-Month Skipper License Exten... (Aug 28)
 -  UIL Energy to Acquire Perth Basin 2D S... (Aug 28)
 -  Galilee Completes Acquisition of ATP 5... (Aug 27)
 -  NPD Grants Statoil Drilling Permit in ... (Aug 27)


Most Popular Articles

From the Career Center
Jobs that may interest you
Mechanical Engineer - Advanced Manufacturing Technology
Expertise: Mechanical Engineering
Location: Louisiana, LA
 
Maintenance Technician
Expertise: Maintenance Technician
Location: Janesville, WI
 
Operator, Production
Expertise: Production Operator
Location: Janesville, WI
 
search for more jobs

Brent Crude Oil : $50.05/BBL 5.23%
Light Crude Oil : $45.22/BBL 6.25%
Natural Gas : $2.72/MMBtu 3.42%
Updated in last 24 hours