Parker Drilling Rig 216 Arrives in Russia

Parker Drilling Company Rig 216 has completed the first leg of its journey to Kazakhstan. The rig, traveling by ship across the Atlantic Ocean, will make its first stop on August 3 in St. Petersburg, Russia, where it will then be transferred for rail shipment to Aksai in northwest Kazakhstan. Spud date for the rig is expected in mid-October.

Rig 216 is the third of three land rigs Parker is contributing to the six-rig SaiPar joint venture under long-term contract with Karachaganak Petroleum Operating BV (KPO). The rig is equipped with the latest technology regarding power generation and distribution. It is an E-2000 drilling rig with depth capabilities in excess of 20,000 ft, designed to operate in severe environments where temperature extremes can range from -20F in winter to 130F in summer. Engine emissions meet the EPA/IMO tier-2 year 2000 and CARB (California Air Resource Board) off-road emission certifications.

In addition to Rig 216, Parker Drilling operates 11 rigs including the SaiPar joint venture and a labor contract in Kazakhstan. The company first operated in Kazakhstan in 1992 and is the leading Western drilling contractor in the country.


Our Privacy Pledge

Most Popular Articles
Related Articles

Brent Crude Oil : $50.79/BBL 1.30%
Light Crude Oil : $49.96/BBL 1.10%
Natural Gas : $2.77/MMBtu 2.12%
Updated in last 24 hours