BP to Proceed with Clair Phase 3 Appraisal

BP announced Thursday that it and its partners have decided to proceed with a two-year appraisal program that will look at developing a third phase of the giant Clair field in the North Sea, west of Shetlands.

The initial commitment involves a two-year program to drill five appraisal wells. This could increase to between eight and 12 wells, depending on results from these first wells. Drilling of the first well commenced recently.

The objectives of the program are to provide greater certainty on overall reservoir volumes, including their distribution and fluid characteristics; to evaluate technologies to improve recovery from Greater Clair; and to test the possibility of new standalone developments and linkages to Clair Ridge.

BP Regional President for the North Sea Trevor Garlick commented in a company statement:

"This is a major milestone and a further big commitment to the west of Shetland by BP and its co-venturers. If successful, the appraisal programme could pave the way for a third phase of development at Clair – this is now a real possibility."

UK Energy Secretary Ed Davey added:

"This announcement by BP of a two year appraisal programme for the Greater Clair area West of Shetland is excellent news. It shows the industry's commitment to maximise the potential in this area, which could hold up to 17 percent of our oil and gas reserves."

"Greater Clair proves there is still a long future for oil and gas production in the North Sea and will give confidence to new recruits that the industry offers a career for life."

Discovered in 1997, the Clair field is located almost 50 miles west of Shetland and extends over an area of 85 square miles. Hydrocarbons initially in place have been estimated at around eight billion barrels of oil equivalent.

So far, the first development phase at Clair have seen BP and its partners process around 90 million barrels. Phase 2, in which production is expected to commence in 2016, is expected to lead to an estimated 640 million barrels of oil produced over 40 years, and will also provide a hub for future expansion.

BP is the operator of Clair, with a 27.62-percent interest. Partners in the field include: Britoil (0.98%), ConocoPhillips UK Sigma (24%), Chevron North Sea (19.42%), Enterprise Oil Limited (18.68%) and Shell Clair UK (9.3%).


 

 



Have a news tip? Share it with Rigzone!
Email news@rigzone.com

WHAT DO YOU THINK?

Click on the button below to add a comment.
Post a Comment
Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

Related Companies
 Company: BP plcmore info


 - BP Says It Is Considering IPO of US Pipeline Assets (Jul 18)
 - Total, BP Unit, YPF Boost Investment in Argentina's Vaca Muerta (Jul 18)
 - Big Oil Sees Salvation in Gas, But What If It's a Wrong Bet? (Jul 18)
 Company: Shellmore info


 - BP Says It Is Considering IPO of US Pipeline Assets (Jul 18)
 - Top Oil Market Summons Poseidon to US-Mideast Crude Fight (Jul 18)
 - Big Oil Sees Salvation in Gas, But What If It's a Wrong Bet? (Jul 18)
 Company: ConocoPhillipsmore info


 - ConocoPhillips to Sell Barnett Assets for $305 Million (Jun 29)
 - ConocoPhillips To Lay Off 300 In Canada After Cenovus Deal (May 4)
 - ConocoPhillips Posts Surprise Loss On Higher-Than-Expected Costs (May 2)
 Company: Chevron Corporationmore info
 - Mexico Delays Next Oil Auction to Let Huge New Find Sink In (Jul 17)
 - White House Is Said to Be Unlikely to Restrict Venezuelan Crude (Jul 7)
 - Oil Producers' Cost-Cutting Swept Away by New Price Decline (Jun 30)
 Company: Britoilmore info
 - BP to Proceed with Clair Phase 3 Appraisal (Mar 28)
 - Teekay Signs Amendment for Foinaven FPSO (Apr 15)
 - RWE Dea Acquires Stake in two ENI UK Assets (Aug 6)
 Company: Enterprise Oil Limitedmore info
 - BP to Proceed with Clair Phase 3 Appraisal (Mar 28)
 - ExxonMobil Resumes Drilling at Beryl in UK North Sea (Sep 8)
 - Enterprise Oil Limited Plans to Repurchase Shares (Oct 18)
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE

More from this Author
Rigzone Staff
e-mail us at news@rigzone.com
 -  LyondellBasell Plans Its Largest Inves... (Jul 21)
 -  Preparing a Mechanical Engineering Res... (Jul 19)
 -  Tesoro Signs Deal with Pemex to Enter ... (Jul 19)
 -  Irish Gas Grid Could Receive LNG from ... (Jul 19)
 -  What's It Take to Land a Job as a Petr... (Jul 14)


Most Popular Articles

From the Career Center
Jobs that may interest you
Technical Services Manager - Production Chemicals
Expertise: Chemist|Production Engineering|Stimulation
Location: Midland, TX
 
United States Houston: R&D Cementing Engineer - Petrophysical Applications
Expertise: Chemical Engineering|Mechanical Engineering|Petroleum Engineering
Location: Houston, TX
 
United States Houston: Application Evaluation Specialist
Expertise: Drilling Engineering|Field Development
Location: Houston, TX
 
search for more jobs

Brent Crude Oil : $48.06/BBL 2.51%
Light Crude Oil : $45.77/BBL 2.17%
Natural Gas : $2.97/MMBtu 2.30%
Updated in last 24 hours