Jubilant Spuds Second Kharsang Extension Well

Printer Friendly Version
Email this Page

India-focused Jubilant Energy reported Monday that it has spud the second well of its Phase III Extension development drilling campaign on the oil-producing Kharsang field in the Upper Assam Basin, onshore northeast India.

The KPL-3E-4 well, located in the northwestern area of the field, is being drilled as an infill development well with the H-00 reservoir as the primary objective and the G-00 reservoir as the secondary target. The well is to be deviated by approximately 1,170 feet towards the southeast from the existing plinth of well KSG No. 27 and will be drilled to a target depth of approximately 3,550 feet measured depth.

The well is expected to take up to three weeks to drill.

The first development well of the current campaign on the Kharsang field, KSG No. 65, was spud Feb. 18 and was successfully drilled to a target depth of 3,755 feet. Nine potentially hydrocarbon-bearing sands were encountered in the well, with total net pay being 144 feet. Eight of these sands appear to be oil-bearing.


 

 



Have a news tip? Share it with Rigzone!
Email news@rigzone.com

Printer Friendly Version
Email this Page

WHAT DO YOU THINK?

Post a Comment Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

Related Companies
 Company: Jubilant Energy Ltd.more info
 - Jubilant Well Successfully Flows Gas (Jun 3)
 - Jubilant Spuds 4th Well at Kharsang (May 20)
 - Jubilant Spuds Third Kharsang Well (Apr 22)
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE

More from this Author
Rigzone Staff
e-mail us at news@rigzone.com
 -  AGR Energy Takes Controlling Stake in ... (Jul 1)
 -  Statoil Finds Oil, Gas near Gina Krog ... (Jul 1)
 -  SeaZip Wins Partnership Deal with Heer... (Jun 30)
 -  Technip Wins Topsides Contract with Ju... (Jun 30)
 -  Statoil Submits Amended Development Pl... (Jun 30)


Most Popular Articles

From the Career Center
Jobs that may interest you
Completions Engineer
Expertise: Petroleum Engineering|Workover or Completion
Location: Oklahoma City, OK
 
Treater House Carpenter and Pipe Insulator
Expertise: Roustabout
Location: Sidney, MT
 
Drilling Manager
Expertise: Drilling Engineering|Drilling Manager|Petroleum Engineering
Location: Houston, TX
 
search for more jobs

Brent Crude Oil : $63.59/BBL 2.54%
Light Crude Oil : $59.47/BBL 1.95%
Natural Gas : $2.83/MMBtu 0.71%
Updated in last 24 hours