Finance & Investing
News Services
Newsletters
Get free industry updates via email.
Daily News
Weekly News
Equipment Updates
Weekly Job Register
Monthly Event Guide
Our privacy
pledge.


advertisement

Jubilant Spuds Second Kharsang Extension Well

change text size

India-focused Jubilant Energy reported Monday that it has spud the second well of its Phase III Extension development drilling campaign on the oil-producing Kharsang field in the Upper Assam Basin, onshore northeast India.

The KPL-3E-4 well, located in the northwestern area of the field, is being drilled as an infill development well with the H-00 reservoir as the primary objective and the G-00 reservoir as the secondary target. The well is to be deviated by approximately 1,170 feet towards the southeast from the existing plinth of well KSG No. 27 and will be drilled to a target depth of approximately 3,550 feet measured depth.

The well is expected to take up to three weeks to drill.

The first development well of the current campaign on the Kharsang field, KSG No. 65, was spud Feb. 18 and was successfully drilled to a target depth of 3,755 feet. Nine potentially hydrocarbon-bearing sands were encountered in the well, with total net pay being 144 feet. Eight of these sands appear to be oil-bearing.


 

 



Have a news tip? Share it with Rigzone!
Email news@rigzone.com

WHAT DO YOU THINK?

Post a Comment Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

Related Companies
 Company: Jubilant Energy Ltd.more info
 - Jubilant Well Successfully Flows Gas (Jun 3)
 - Jubilant Spuds 4th Well at Kharsang (May 20)
 - Jubilant Spuds Third Kharsang Well (Apr 22)

More from this Author
Rigzone Staff
e-mail us at news@rigzone.com
 -  Icon Offshore Gets Petronas Carigali's... (Feb 26)
 -  Bumi Armada's 2014 Net Profit Dips 49.... (Feb 26)
 -  AWE Updates on its Upstream Developmen... (Feb 26)
 -  Statoil Awards Mariner Supply Contract... (Feb 26)
 -  Alam Maritim to Supply Accommodation W... (Feb 25)
Most Popular Articles
From the Career Center
Jobs that may interest you
Senior Reservoir Engineer
Expertise: Field Development|Petroleum Engineering|Reservoir Engineering
Location: Anchorage, AK
 
Drilling Engineer - Deepwater GoM
Expertise: Drilling Engineering|Petroleum Engineering
Location: Houston, TX
 
Head Petroleum Engineer or Geologist
Expertise: Geologist|Geophysicist|Petroleum Engineering
Location: Henderson
 
search for more jobs