Finance & Investing
News Services
Newsletters
Get free industry updates via email.
Daily News
Weekly News
Equipment Updates
Weekly Job Register
Monthly Event Guide
Our privacy
pledge.


advertisement

PetroNeft All Smiles over Arbuzovskoye Production Rates

change text size

PetroNeft Resources plc, owner and operator of Licences 61 and 67, Tomsk Oblast, Russian Federation, provided the following update on its operations at Licence 61.

Highlights:

  • Arbuzovskoye well 105 successfully completed
    • Initial oil flow rate of 160 barrels of oil per day (bopd), with no water production
  • Successful workover restores production at Arbuzovskoye well 102 to 380 bopd
  • Recent pressure testing of two Arbuzovskoye wells shows normal pressure decline
  • Arbuzovskoye water source well completed, planned pressure maintenance to commence shortly
  • Timing and location of future Arbuzovskoye wells to be determined by response to pressure maintenance program
  • Total production increased to 2,800 bopd

Licence 61 - Arbuzovskoye Pilot Development Program

Arbuzovskoye well 105, the sixth well in the current program, has been successfully tested at an initial rate of 160 bopd with no visible water cut.

Further to last month's update, pressure testing of two wells at Arbuzovskoye was carried out which indicated that reservoir pressures are in line with expectations based on volumes produced to date. This confirmed that the rapid decline in production experienced in the Arbuzovskoye 102 well in January and February was due to a near-wellbore problem resulting from likely migration of fine grained materials that had plugged the perforations and was not due to problems with reservoir pressure. As a result an underbalanced re-perforation of the Arbuzovskoye 102 well was performed, which successfully removed the flow restrictions in the well and restored production to 380 bopd.

Following the success of this remediation procedure, other Arbuzovskoye wells are currently being examined with a view to re-perforating additional wells in the near term.

A water source well has now been drilled to supply injection water for the planned pressure maintenance program at Arbuzovskoye. Locations and timing of further production wells will be selected based on the response to the pressure maintenance program. The objective is to optimize recovery from the field and allow the pressure maintenance system time to get established. It is likely that at least three additional wells will ultimately be drilled from Arbuzovskoye Pad 1 to fully exploit the area.

Arbuzovskoye contains 2P reserves in excess of 13 million barrels of oil according to independent reserve auditors Ryder Scott and is the Company's second field being developed.

Licence 61 - Production

Total oil production, comprising both the Lineynoye and Arbuzovskoye oil fields has increased up to 2,800 bopd after successful completion of 105 well and re-perforation of 102 wells at Arbuzovskoye.

Dennis Francis, chief executive officer of PetroNeft Resources plc, commented:

"Development work at Arbuzovskoye has been positive this past month. Not only has the pressure testing of two wells confirmed normal pressure decline for the field in line with production, but the workover of well 102 was successful. We will now implement the planned pressure maintenance program on the field which will slow production decline and improve recoveries. A similar program was implemented at Lineynoye field where we had positive results."

WHAT DO YOU THINK?

Post a Comment Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

Related Companies

Most Popular Articles
From the Career Center
Jobs that may interest you
Reservoir Development Manager
Expertise: Geophysicist, Production Engineering, Reservoir Engineering
Location: Anchorage, AK
 
Electronics Engineer (Subsea Controls)
Expertise: Electrical Engineering, Subsea Engineering
Location: Houston, TX
 
Deepwater - Interventions Engineer
Expertise: Production Engineering, Subsea Engineer
Location: Houston, TX
 
search for more jobs