Subsea 7 Scoops Up Petrobras Work Offshore Brazil

Printer Friendly Version
Email this Page

Subsea 7 S.A. announced the award of three contracts with a combined value in excess of $300 million from Petrobras.

The scope of work comprises the installation of flexible lines by the Seven Seas, under two lump sum contracts and one day rate contract.

The lump sum contracts encompass the installation of two export flexible Lazy Wave Risers at the Sapinhoa and Lula NE fields in the Santos Pre-Salt Basin in water depths of approximately 6,890 feet (2,100 meters). The day-rate contract encompasses the project management, engineering and installation of Petrobras - supplied flowlines and umbilicals. Operations will commence in 2013.

"We’re proud to be selected by Petrobras to perform these important projects, using our in-depth experience of operating in ultra-deep water. We look forward to supporting Petrobras in future developments," Subsea 7 Senior Vice President for Brazil Victor Bomfim said.

Printer Friendly Version
Email this Page

WHAT DO YOU THINK?

Post a Comment Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

Related Companies
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Head of Petroleum Engineering
Expertise: Petroleum Engineering|Reservoir Engineering
Location: Houston, TX
 
Electrical Engineer
Expertise: Electrical Engineering
Location: Texas, TX
 
Electronics Test Engineer
Expertise: Electrical Engineering
Location: Houston, TX
 
search for more jobs

Brent Crude Oil : $62.07/BBL 0.09%
Light Crude Oil : $56.93/BBL 0.05%
Natural Gas : $2.82/MMBtu 1.43%
Updated in last 24 hours