Finance & Investing
News Services
Newsletters
Get free industry updates via email.
Daily News
Weekly News
Equipment Updates
Weekly Job Register
Monthly Event Guide
Our privacy
pledge.


advertisement

Brent Pipeline System Restarts after 5-Day Shutdown

change text size

TAQA Bratani reported late Thursday morning (UK time) that the Brent pipeline system in the UK North Sea has restarted after a temporary shutdown March 2.

The company said that it has begun the process of restoring the flow of an estimated 80,000 barrels of oil per day (bopd) into the Brent pipeline system.

The pipeline system, operated by TAQA, was shut down Saturday after what the company described as a "small hydrocarbon release" was detected within one of the Cormorant Alpha platform's legs. Soon afterwards, TAQA removed 71 non-essential personnel from the platform as a precaution.

The leak was the second such incident to involve a particular leg of the Cormorant Alpha platform. In mid-January the Brent Pipeline System was shut down for several days after hydrocarbons were detected in the leg.

But TAQA said Thursday that investigations have found that there is no connection between the pipeline system and the pipeline involved in the release.

Cormorant Alpha usually handles approximately 90,000 bopd, feeding the Brent Pipeline System. According to Oil & Gas UK the fields that use the pipeline system account for around 10 percent of UK production.

 

 



A former engineer, Jon is an award-winning editor who has covered the technology, engineering and energy sectors since the mid-1990s. Email Jon at jmainwaring@rigzone.com

WHAT DO YOU THINK?

Post a Comment Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

Related Companies

More from this Author
Jon Mainwaring
European Editor | Rigzone.com
 -  Crimea: the Oil, Gas Story (Apr 14)
 -  Repsol Hired 1,062 New Employees in 20... (Apr 14)
 -  BP Competition Winners Look Forward to... (Apr 11)
 -  VNG's Pil Well Flows at 6,710 Bopd (Apr 10)
 -  Enegi Oil Restructures Marginal Fields... (Apr 10)
Most Popular Articles
From the Career Center
Jobs that may interest you
Industrial Pipefitter
Expertise: Welder / Fitter / Turner
Location: Houston, TX
 
Haul Truck Driver (Pumping Units)
Expertise: Heavy Machinery Operator
Location: Hobbs, NM
 
Operations Engineer III
Expertise: Plant Operations Engineer
Location: Port Arthur, TX
 
search for more jobs