HRT Notes Arrival of Transocean Marianas

Printer Friendly Version
Email this Page

HRT Participações em Petróleo S.A. announced that the drilling rig Transocean Marianas (DW semisub) from Transocean arrived in Walvis Bay at 5:00 a.m. local time. The rig will undergo mandatory maintenance for the next three to four weeks, before starting HRT's drilling campaign in Walvis and Orange sedimentary basins.

As noted by the Company Jan. 15, the Marianas is expected to commence drilling operations on the Wingat Prospect, in Walvis basin at HRT's Petroleum Exploration License 23 (PEL-23), by March 2013. Wingat is located at a water depth of 3,281 feet (1,000 meters) and drilling operations are expected to last approximately 60 days.

Printer Friendly Version
Email this Page
For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit www.riglogix.com.
Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Design Engineer - Las Vegas
Expertise: Design Engineer
Location: Las Vegas, NV
 
API 936 Inspector
Expertise: QA / QC / Inspection|Reliability Engineer
Location: Iuka, MS
 
Mechanical CAD Designer
Expertise: Design Engineer|Instrumentation Technologist|Mechanical Engineering
Location: Houston, TX
 
search for more jobs

Brent Crude Oil : $62.01/BBL 2.48%
Light Crude Oil : $56.96/BBL 4.22%
Natural Gas : $2.78/MMBtu 1.76%
Updated in last 24 hours