Target Energy Starts O&G Production at Darwin-1 well

Target Energy advised Tuesday that oil and gas production has started at the onshore Darwin-1 well in the company's Fairway Project in West Texas.

Darwin-1 was brought online Jan.18, following the hook-up of the well to the local gas gathering system. The well is presently producing around 140 barrels of oil per day and 170 thousand cubic feet of gas per day.

Target's Managing Director said: "Work continues at our Darwin-2 and Sydney-1 wells. We have a completion rig at Darwin-2 and expect to start testing soon. At Sydney-1 we have just brought a replacement for the original drilling rig which was experiencing persistent repairs. We are already back to drilling there and look forward to the results from that well."

WHAT DO YOU THINK?

Post a Comment Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

Events  SUBSCRIBE TO OUR NEWSLETTER

Our Privacy Pledge
SUBSCRIBE


Most Popular Articles


From the Career Center
Jobs that may interest you
Production Engineer
Expertise: Petroleum Engineering|Production Engineering|Production Operator
Location: Eagle Ford, TX
 
Transload Operator
Expertise: Control Room Operations|Fracturing|Production Operator
Location: Ft. Stockton
 
Production Planner - Evansville, WY
Expertise: Planner / Scheduler|Production Technologist
Location: Evansville, WY
 
search for more jobs

Brent Crude Oil : $49.52/BBL 5.15%
Light Crude Oil : $45.17/BBL 4.54%
Natural Gas : $2.75/MMBtu 1.10%
Updated in last 24 hours