Finance & Investing
News Services
Newsletters
Get free industry updates via email.
Daily News
Weekly News
Equipment Updates
Weekly Job Register
Monthly Event Guide
Our privacy
pledge.


advertisement

Incremental Oil and Gas Starts Four-Well Drilling Program

change text size

Incremental Oil and Gas announced Monday that the first well in its current drilling program in its wholly owned Florence oilfield in Colorado has begun. Patti 32-29 Sidetrack started operations on Jan.18. The existing Patti well will be side-tracked at 2,389 feet and drilled directionally to a seismically defined anomaly to a depth of 4,360 feet.

Patti sidetrack is the first of four wells to be drilled in this campaign, all to target the shallow fractured Pierre Shale. All four wells are expected to be drilled in less than 6 weeks and should be placed on production shortly thereafter.

Commenting on the project, Incremental Oil and Gas’s Managing Director Gerry McGann said: "It is exciting to be drilling new wells in our Florence Field. Pierre wells drilled by the previous owner of the field had an initial production rate averaging about 150 bopd, and we would hope to be able to at least replicate that production rate."
 

WHAT DO YOU THINK?

Post a Comment Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.


Most Popular Articles
From the Career Center
Jobs that may interest you
Field Operator
Expertise: Production Operator
Location: Hobbs, NM
 
Senior Drilling Engineer
Expertise: Drilling Consultant
Location: North East
 
Jet Pump Technician/Rod Running Technician
Expertise: Rig Instrument Tech
Location: India
 
search for more jobs