Finance & Investing
News Services
Newsletters
Get free industry updates via email.
Daily News
Weekly News
Equipment Updates
Weekly Job Register
Monthly Event Guide
Our privacy
pledge.


advertisement

PSA Grants Dong Approval to Explore PL 289

change text size

The Petroleum Safety granted Dong E&P Norge consent to conduct exploratory drilling on well 3/7-9S. The objective of the drilling activity is to examine the potential of a prospect in Production License 289.

Dong previously drilled an exploration well 3/7-7, at the Marsvin prospect, in 2008 but failed to hit commercial pay. The operator plans to recommence drilling at the site in January/February and the activity will have a duration of about 90 days.

Dong plans to use the Maersk Giant (350' ILC) jackup drilling facility at the location, which resides in a water depth of about 220 feet (67 meters).
 



Have a news tip? Share it with Rigzone!
Email news@rigzone.com

WHAT DO YOU THINK?

Post a Comment Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

Related Companies
For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit www.riglogix.com.

More from this Author
Rigzone Staff
e-mail us at news@rigzone.com
 -  Hibiscus Clears Australian FIRB's Hurd... (Aug 22)
 -  Petrofac Chairman Resigns (Aug 22)
 -  Atlantic Farms Out PL528 Stake to Reps... (Aug 22)
 -  Rosneft Signs Collaboration Deal with ... (Aug 22)
 -  Santos' Underlying 1H 2014 Net Profit ... (Aug 22)
Most Popular Articles
From the Career Center
Jobs that may interest you
Senior Drill Rig Operator
Expertise: Driller, Mud Engineer / Drilling Fluids
Location: Hugoton, KS
 
Assistant Drill Rig Operator
Expertise: Driller, Mud Engineer / Drilling Fluids
Location: Hugoton, KS
 
Site Safety Lead (Completion & Production)
Expertise: Environmental Safety & Training, HSE Manager / Advisor, Regulatory Compliance
Location: Wyoming, WY
 
search for more jobs