Finance & Investing
News Services
Newsletters
Get free industry updates via email.
Daily News
Weekly News
Equipment Updates
Weekly Job Register
Monthly Event Guide
Our privacy
pledge.


advertisement

89 Workers Hurt in Jurong Jackup Accident

change text size
89 Workers Hurt in Jurong Jack-Up Rig Accident

Singapore's Ministry of Manpower confirmed Monday evening (local time) that all Jurong Shipyard workers have now been accounted for after a jackup rig under construction at the yard tilted over earlier in the day.

Eighty-nine workers were hurt as a result of the accident, although the ministry reported that 77 of these have now been discharged from hospital after receiving treatment for minor injuries. Of the remaining 12, six are in normal hospital wards while another six remain under observation.

Speaking outside the Accident & Emergency department at Singapore General Hospital Monday evening, Senior Parliamentary Secretary for Manpower Hawazi Daipi commented: "MOM takes a very serious view of the accident – this is one of the worst industrial accidents we have seen in recent times. The priority now is to look after the injured and ensure that they receive the best care possible. It is also important to stabilize the situation at the work site and investigate the accident thoroughly to find out what went wrong."

The accident occurred Monday morning when one of the three legs of a jackup rig failed, causing the rig to tilt to one side.

The rig was reported to be the Noble Regina Allen (400' ILC), a jackup being built for Swiss rig contractor Noble Corporation.

National Oilwell Varco was understood to have had 18 workers on board the rig at the time of the accident, according to reports.

The Noble Regina Allen rig was scheduled to be delivered during the first quarter of next year to begin work for Gaz de France offshore from the Netherlands. It was designed by naval architects Friede & Goldman and is the first of six jackups in F&G's JU3000N class of rigs. Capable of operating in depths of up to 400 feet, it has a rated drilling depth of 35,000 feet.

 



A former engineer, Jon is an award-winning editor who has covered the technology, engineering and energy sectors since the mid-1990s. Email Jon at jmainwaring@rigzone.com

WHAT DO YOU THINK?

Post a Comment Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.
James Stevens | Dec. 3, 2012
We used to build them all the time here in Brownsville Texas and never had a structural failure like that. I hope they are using better steel than what was supplied with all the camping equipped private labelled for Coleman back in 2004. That cost a pretty penny but did not cause any loss of human life. Trust and Integrity are the key words in this issue. jws tx


Related Companies

More from this Author
Jon Mainwaring
European Editor | Rigzone.com
 -  Key Oil, Gas Figures Welcome Scotland'... (Sep 19)
 -  Falkland Oil and Gas Makes Progress Ah... (Sep 16)
 -  One Millionth Barrel Delivered from Ar... (Sep 15)
 -  Inside GE's New Technology Solutions C... (Sep 12)
 -  BP, Shell Urge Scotland to Vote agains... (Sep 11)
Most Popular Articles
From the Career Center
Jobs that may interest you
HSE Coordinator Senior
Expertise: Environmental Engineer, Environmental Safety & Training, HSE Manager / Advisor
Location: Midland, TX
 
HSE Advisor 4
Expertise: HSE Manager / Advisor
Location: Perth
 
Process Safety Engineer
Expertise: QA / QC / Inspection, Safety Engineering
Location: Greater London
 
search for more jobs